• 1. 
    For Field Test , Significant depth of Exploration For isolated fdn :

  • 0.5 to 1 times the width
  • 1.5 to 2 times the width
  • 2.5 to 4 times the width
  • None
  • 2. 
    ELECTRICAL CONDUITS should be laid :-

  • AFTER PLASTERING
  • AFTER PAINTING COMPLETED
  • DURING BRICK WORK
  • NONE
  • 3. 
    Which of the following is not the type of Road :

  • Flexible Pavement
  • Rigid Pavement
  • WBM Road Foot Path
  • Wooden Pavement
  • 4. 
    For Thermal Expansion and Contraction and to resist Sway Caused by Wind in Boundary Wall :-

  • Expansion joint at Every 2‐5 m
  • Expansion joint at Every 4‐8 m
  • Expansion joint at Every 12‐15 m
  • None
  • 5. 
    Which of the following is not Major Equipment :

  • AB Switch
  • VCB
  • Transformer
  • HG Fuse
  • 6. 
    For Field Test , Significant depth of Exploration For Pile fdn :

  • 1m to 5m
  • 5m to 15m
  • 20m to 35m
  • All of above
  • 7. 
    Which of the following is not correct for Pole Structures :

  • The pole shall be erected such that minimum 1/6th of the total length of the pole shall be embedded into the ground surface
  • Orientation of Poles structures shall be according to the loading or stringing direction
  • The loading on the poles can be exceeded its design capacity, consider a considerable factor of safety on loads as the poles are manufactured in un-monitored conditions
  • The pole shall be erected such that minimum 1/6th of the total length of the pole shall be embedded into the ground surface
  • 8. 
    In Friction piles type of Deep Foundations :-

  • Terminated at Lower depth
  • Terminated at Higher depth
  • Terminated at Average depth
  • None
  • 9. 
    In reamed piles type of Deep Foundations :-

  • are constructed to a depth of 1 to 3m into the ground
  • are constructed to a depth of 3 to 8m into the ground
  • are constructed to a depth of 10 to 18m into the ground
  • None
  • 10. 
    Which of the following is type of Transformer Foundation:-

  • Pedestal Type
  • Block Type
  • Both of the above
  • None of these
  • 11. 
    Which of the following is not the type of Line Structure :

  • DTR Structure –SP / DP PSC / RSJ / Tubular
  • Equipment Support Structure –DP / Lattice
  • Road / River Crossing RSJ / Tubular / Lattice
  • None
  • 12. 
    Which of the following is not the type of Pole Foundation :

  • Rectangular
  • Circular
  • Pyramidal
  • None
  • 13. 
    What is the MINIMUM REQUIREMENT of Contour survey extending outside the boundary wall on all sides :

  • up to at least 2 m
  • up to at least 5 m
  • up to at least 10 m
  • None
  • 14. 
    What is WBM Road Foot Path :-

  • Water Bound Macadam
  • Water Below Main Road
  • Water Between Main Road
  • Water Bounded by main road
  • 15. 
    Which of the following is not the type of Substation Structure :

  • Gantry Structure–DP / Lattice
  • Outgoing Feeder–RSJ Pole (DP)
  • Road / River Crossing RSJ / Tubular / Lattice
  • Equipment Support Structure –DP / Lattice
  • 16. 
    In LAYOUT FINALISATION, which of the following is not the Secondary Details :-

  • Future expansion of switchyard should be easily possible
  • In seismic prone zones height of structures should be as low as possible.
  • Location and Orientation of Main Entry of Switchyard
  • The outgoing transmission line should not cross each other