MCQ Mojo
access_time
menu
Quiz
Web Stories
CBSE
arrow_drop_down
MCQ Questions for CBSE Class 12 with Answers
MCQ Questions for CBSE Class 11 with Answers
MCQ Questions for CBSE Class 10 with Answers
MCQ Questions for CBSE Class 9 with Answers
MCQ Questions for CBSE Class 8 with Answers
MCQ Questions for CBSE Class 7 with Answers
MCQ Questions for CBSE Class 6 with Answers
MCQ Questions for CBSE Class 5 with Answers
MCQ Questions for CBSE Class 4 with Answers
MCQ Questions for CBSE Class 3 with Answers
MCQ Questions for CBSE Class 2 with Answers
MCQ Questions for CBSE Class 1 with Answers
CBSE
arrow_drop_down
MCQ Questions for CBSE Class 12 with Answers
MCQ Questions for CBSE Class 11 with Answers
MCQ Questions for CBSE Class 10 with Answers
MCQ Questions for CBSE Class 9 with Answers
MCQ Questions for CBSE Class 8 with Answers
MCQ Questions for CBSE Class 7 with Answers
MCQ Questions for CBSE Class 6 with Answers
MCQ Questions for CBSE Class 5 with Answers
MCQ Questions for CBSE Class 4 with Answers
MCQ Questions for CBSE Class 3 with Answers
MCQ Questions for CBSE Class 2 with Answers
MCQ Questions for CBSE Class 1 with Answers
Quiz
Quiz
/
Foundation engineering Gate & PSU MCQ Questions With Answers
1.
Mini-piled underpinning is generally used when the loads from the foundations need to be transferred to stable soils at considerable depths - usually in excess of 5 meters
True
False
2.
The following are the ways of achieving underpinning except
soil treatment
Piling
Load transfer and soil treatment
Load transfer
3.
How is mathematics used in science and engineering?
in estimating materials and cost
in measurements
to analyze data
All of above
4.
Pile testing on site in an expensive procedure, no matter whether being performed on a special pile or service pile
TRUE
FALSE
5.
What is the formula for Gravitational Potential Energy?
PE = mgh
KE = 1/2mv2
W = Fd
P = W/t
6.
How much KE does a moving 6 kilogram object have if it moves with a velocity of 3 m/s?
27 J
18 J
9 J
2 J
7.
Identify the figure
Jacked pile underpinning
Mini-piled Underpinning
Beam and base underpinning
None of the above
8.
Belt of an electric motor is broken, it needs
Corrective maintenance
Scheduled maintenance
Preventive maintenance
Timely maintenance
9.
A systematic approach for maintenance is
Problem – Cause – Diagnosis – Rectification
Problem– Diagnosis – Cause – Rectification
Problem – Measure – Diagnosis – Rectification
Problem– Diagnosis – Measure – Rectification
10.
A large factor of safety should be adopted in the design of _____ as it is difficult to assess the actual loads.
Pile method
Horizontal shore
Pit method
Vertical shores
11.
A system can be defined as
A collection of parts that work together to complete a purpose
A system
A piece of a whole
A group that individually does work
12.
In ____ method, the piles are driven along both the sides of existing wall and the needle in the form of pile caps are provided through the existing one.
Miscellaneous method
Vibroflotation
Pit method
Pile method
13.
Which of the following is a disadvantage of the pit method of underpinning?
Simplicity of the engineering
Having moderate deformation of the structure
Low cost of labor to produce result
None of the above
14.
Usually in design of wall, Pu=____ * T
1
2
3
4
15.
For a continuous balanced anchor, the ultimate resistance of anchor/m run is obtained by
Considering active force
Considering passive force
Difference of active and passive forces
Summation of lateral forces
None of these
16.
It occurs when an asset requires immediate attention in order to keep a facility operational or safe. What type of maintenance is this?
Planned maintenance
Corrective maintenance
Running maintenance
Emergency maintenance
17.
What type of device is this?
Input
Output
Storage
18.
The placing of new Foundation below and existing foundation of the process of strengthening the existing Foundation is known as the ___________ of foundation.
Shoring
Underpinning
Grouting
Scaffolding
19.
With the increase in preventive maintenance cost, breakdown maintenance cost
Increases
Decreases
Remain same
Any of the above
20.
The occurrence of negative skin friction around a pile is primarily dependent on
type of surrounding soil
type of pile
both type of pile and soil
none of these
21.
When one building is higher than the other, _________ may be provided on the horizontal shores.
Pit Underpinning
Flying shore
Pile Underpinning
Raking shore
22.
As mass increases, KE ...
increases
decreases
stays the same
All of above
Report Question
Previous
Next
warning
Submit
access_time
Time
Report Question
A bunch of text
Support mcqmojo.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page