• 1. 
    The developer can perform certain obvious tests, knowingthe input variables and the corresponding expected output Variables

  • Initially Quick test
  • modules with Complex logic & condition
  • run the product under debugger or IDE
  • 2. 
    The other name for bug is known as..................

  • Anomaly
  • Failure
  • Fault
  • Deaft
  • 3. 
    Reliability of a software system derives from ............ and .............

  • Usability and efficiency
  • Integrity and Portability
  • Correctness and Availability
  • Extensibility and Testability
  • 4. 
    Data Defect associated with incorrect design of data structures.

  • True
  • False
  • 5. 
    necessary to have test cases that exercise each Boolean expression and have test cases test produce the TRUE and FALSE paths.

  • Condition Coverage
  • Path Coverage
  • Both
  • un Condition Coverage
  • 6. 
    Beta testing is done at

  • User’s end
  • Developer’s end
  • User’s & Developer’s end
  • None of the mentioned
  • 7. 
    The testing in which code is checked

  • Black box testing
  • White box testing
  • Red box testing
  • Green box testing
  • 8. 
    A test harness is a

  • A high level document describing the principles, approach and major objectives of the organization regarding testing
  • A distance set of test activities collected into a manageable phase of a project
  • A test environment comprised of stubs and drives needed to conduct a test
  • A set of several test cases for a component or system under test
  • 9. 
    A __________is a program point at which the control flow can diverge

  • Decision
  • Case Statement
  • Junction
  • None
  • 10. 
    The items below should be included in test case, except..

  • Test input
  • Expected result
  • Test data
  • Metric and statistical data
  • 11. 
    Switch is a multi way decision statements

  • True
  • false
  • 12. 
    Which of the following is non-functional testing?

  • Black box testing
  • Performance testing
  • Unit testing
  • None of the mentioned
  • 13. 
    By collecting ________ during software testing, it is possible to develop meaningful guidelines to halt the testing process.

  • Failure intensity
  • Testing time
  • Metrics
  • All of the mentioned
  • 14. 
    Generate test data to make the program enter the sequential block, to make it go through the entire block

  • Sequential control flow
  • Two-way decision statements
  • Multi-way decision statements
  • Loops like while do,
  • 15. 
    ___________ loops fall between single and nested loops with respect to test cases

  • Concatenated
  • Horrible
  • Nested
  • None
  • 16. 
    Typographical Defects is under which test class

  • coding Defect
  • Testing Defect
  • Design Defect
  • 17. 
    Attributes of Product Revision

  • Maintainability
  • Usability
  • Integrity
  • Interoperability
  • 18. 
    Test Cases need to be developed for

  • valid inputs
  • invalid inputs
  • both valid and invalid inputs
  • expected outputs
  • 19. 
    Code coverage testing involves designing and executing test cases and finding out the percentage of code that is covered by testing.

  • True
  • False
  • 20. 
    Which Phase in Tester life state there is no difference between testing and debuggin

  • Phase 0
  • Phase 1
  • Phase 2
  • Phase 3
  • 21. 
    The path segment for which every node is visited atmost once is said to be

  • DU path
  • Simple path segment
  • loop free path
  • defination clear path segment
  • 22. 
    Each defect and frequency of occurrence must be recorded after testing.

  • Yes
  • No
  • 23. 
    In which testing level the focus is on customer usage?

  • Alpha Testing
  • Beta Testing
  • Validation Testing
  • Both Alpha and Beta
  • 24. 
    Are the following statements true?Verification - confirmation by examination and objective evidence that specified requirements have been fulfilled (are we building the product right?) Validation - confirmation by examination and objective evidence that the requirements for a specific intended use of application has been fulfilled (are we building the right product?)

  • True
  • False
  • 25. 
    A ....................... can be regarded as any failure to address end-user requirements.

  • Software error
  • Software bug
  • Software Defect
  • Software failure
  • 26. 
    ____________ designs the system and is accountable to the buyer

  • Builder
  • Buyer
  • User
  • Tester
  • 27. 
    The customer may provide insufficient or incorrect information causes

  • error
  • fault
  • defects
  • failure